by Jenni123 | May 29, 2025 | Uncategorized
Area H7(b) of this large-scale development, south of the old Filton Airfield, is now near completion with new residents starting to move in. We have been involved in this development of 124 new plots, comprising 2, 3 and 4 bedroom housing located off the A4018 into...
by Jenni123 | May 28, 2025 | Uncategorized
Our client, Durrance Developments, has built a stunning new two-storey residential building in north-west Bristol, utilising energy-efficient Insulated Concrete Formwork (ICF) on top of a raft slab foundation, due to the tall adjacent pine trees. Durrance Developments...
by Jenni123 | May 2, 2025 | Uncategorized
Civil engineering, drainage and house foundation construction work has commenced on the new development of 23 plots on Park Road, Malmesbury for Cotswold Homes.
by Jenni123 | Apr 30, 2025 | Uncategorized
These aluminium mesh sails are freestanding and will be restrained back to the main structural members of the building at each floor level. In so doing, they must remain stable in their own right in relation to the increasing applied wind loads at that height. The...
by Jenni123 | Mar 7, 2025 | Uncategorized
We are delighted to welcome Koushik Puliyamgote to the team. Koushik joined us in January 2025 as a graduate structural engineer who completed his MSc in December 2024 from Nottingham University.
by Jenni123 | Feb 19, 2025 | Uncategorized
The architectural brief for this project involves demolishing an existing single-storey stable to build a new two-storey residential property over the same footprint with the lower ground floor level being formed via a large subterranean dig. We were asked to provide...